Fletcher Steel -Northern Region Distribution Centre
Background
Fletchers Northern Region Distribution Centre is the primary Auckland hub for Fletcher Steel, handling commercial steel dispatch including rebar, girders, and heavy steel products. The site operates large-capacity gantry cranes on a 24/5 schedule, making lighting task-critical to operator safety. The ageing system was delivering inadequate, non-uniform illumination, and multiple work areas failed to meet compliance standards – a safety and operational risk requiring urgent resolution.
NuGreen Solution
NuGreen proposed a full LED luminaire replacement, specifying a long-life solution providing 10 years of maintenance-free operation. Existing luminaire positions were retained as they were already optimally located. NuGreen coordinated closely with site stakeholders to manage contractor access, equipment delivery, and where necessary the temporary movement of stock — all while maintaining the continuous 24/5 operation throughout the upgrade.
The Results
- 50% average improvement in light levels – every area of the site now compliant.
- 56% reduction in lighting-related energy consumption, independently verified by Deta Consulting.
- Annual savings of 219,260 kWh and 24.1 tonnes of carbon achieved.
- 10-year maintenance-free LED solution delivering long-term operational savings.
KWH SAVED PER ANNUM
CARBON TONNES SAVED PER ANNUM
EQUIVALENT AVERAGE HOUSEHOLD SAVED