First Light Capital – 98 Kerrs Road, Auckland

Background

Lighting at the 98 Kerrs Road facility required improvement to better support daily building operations. The existing system lacked consistency and efficiency, producing uneven lighting and higher than necessary energy use. The inadequate illumination created a poor working environment for occupants and contributed to elevated operational costs. NuGreen Energy Solutions was engaged to upgrade the lighting and deliver improved efficiency and uniform illumination throughout the building.

NuGreen Solution

NuGreen installed modern, high-performance lighting fixtures designed to improve illumination quality and energy efficiency across the facility. The upgrade created consistent lighting throughout all workspaces and shared areas, improving visibility and comfort for occupants. Long-life LED technology was selected to reduce the frequency and cost of future maintenance. NuGreen managed the full project end-to-end, covering assessment, design, supply, and installation.

The Results
  • More uniform lighting throughout the building – improved ambience and visual clarity.
  • Annual energy savings of 29,018 kWh and $9,537 achieved.
  • Carbon emissions reduced by 3.19 tonnes per year.
  • Client reported a noticeable improvement in lighting performance and overall environment.